PEARL STREET, WATERTOWN, NEW YORK
* Notify UFPO. * Advanced 37 Borings to the Top of Bedrock using 3 ¼ HSA. * Collected Continuous 2 Split Spoon Samples. * Installed (8) Bedrock Wells and Overburden Well. * Cored Bedrock using an HQ Core Barrel. * Installed 4 X 5 Protective Casings. * Constructed a Decon Pad. * Completed Several Test Pits using an Excavator. * Decontaminated Tools and Equipment. * Drilled Site using a Track Mounted Drill Rig. |
|
Lu Engineers, Sewall's Island Site |