SITE WORK AND DEVELOPMENT

SYRACUSE, NEW YORK

As part of a grant for alternative fuel vehicle infrastructure projects, CuseCar implemented it’s Preparing for the Future – Alternative Energy Infrastructure Project in the Syracuse Metropolitan Area.

CuseCar operates a community car-sharing program headquartered in Syracuse to enhance the existing transportation system and develop additional, complimentary sustainable alternatives. Installation of electric vehicle charging stations will be done at designated locations throughout the Syracuse Metropolitan Area. The Farmers Market parking lot in downtown Syracuse is the first such location.

PEC was Contracted to Install Electric Conduit and Electric Vehicle Charging Stations at the Syracuse Farmer’s Market.

*   Notify UFPO.
*   Pull City of Syracuse Permits.
*   Saw Cut an Estimated 270’ of Asphalt.
*   Excavate a Trench 3’ x 3’ x 250’.
*   Install (10) HDPE 36” Riser Pipes at each
    Pulling Station.

*   Run Separate 1 ½” Conduit for each Station
    and Stub Up and Cap.

*   Install (2) 2’ 8” Sleeves to 4” Below Grade for
    Future Bollard Installation.

*   Backfill Trench to 95% Compaction with
    Item 4 Stone.

*   Place 3” of Asphalt Binder to Meet Existing Grade.
*   Survey Future Foundations in Place.
*   Load, Transport and Dispose of all Spoils.


Syracuse Farmer's Market, Electrical Charging Stations
Designed and Managed by