TANK INSTALLATION AND REMOVAL



EAST SYRACUSE, NEW YORK

Removed (2) 12,000-gallon steel underground gasoline tanks and (1) 12,000-gallon steel underground diesel tank. Installed (2) new 10,000-gallon fiberglass underground gasoline tanks and (1) 15,000-gallon fiberglass underground diesel tank.

Services Provided:

*   Notified UFPO.
*   Removed Remaining Liquid from Tanks.
*   Removed Concrete Tank Mat and Disposed.
*   Removed Tanks; Purge, Cut, Clean and Disposed of
    at a NYSDEC Approved Facility.

*   Installed Shoring for New Tank Installation.
*   Excavated for New Tanks.
*   Installed Filter Fabric in Tank Excavation.
*   Installed Stone Base, Set Owner Supplied Deadman.
*   Set Owner Supplied Tanks and Anchored to Deadman
    with Owner Supplied Straps and Turnbuckles.

*   Backfilled Tanks with Manufacture Approved Material.
*   Supplied and Installed Tank Top Equipment and Piping
    per Specification.

*   Backfilled Tanks to Grade; Formed and Poured
    New Tank Mat.

*   Completed Landscape and Asphalt Restoration.
*   Start Up, Purge Dispenser.
*   Painted and Labeled Fills.