UTILITY / SUBSTATION CONSTRUCTION
Electrical Substation Expansion / Construction Project


Civil Work:

*   Erosion Control Measures.
*   Construct New Access Road and Vehicle Turn Around Area.
*   Install One New 20’ Vehicle Access Gate in Existing Fence.
*   Install One New 4’ Pedestrian Gate in Existing Fence.
*   Top Soil and Seed.


Foundations:

*   New Foundation (1) for New Control House.
*   New Foundation (1) for New Generator.
*   New Foundation (1) for New Generator Fuel Tank.


In-Ground Work:

345KV Yard:

*   Install New Ground Grid Connections to the Existing
    Ground Grid for: New Control House, New Generator and
    New Generator Fuel Tank.
*   Install New Underground Raceways as Shown on
    Conduit Plan.
*   Modify Existing Pull Box #1 at the Existing Control House.
*   Install New Trench #2 from the Existing Pull Box #1 to the
    New Control House.
*   There are Three Circuits which will Require Removal and
    Reinstallation to Facilitate the Installation of New Trench #2.
    These are Conduits #1, #7 and #27 as Shown on
    DWG C-18677-E.  The Contractor shall Remove these and
    Replace with New.
*   Extend Existing Ground Grid for New Man Gate and Vehicle
    Access Gate.  










National Grid - Alps, NY