Civil Work:
* Erosion Control Measures. * Construct New Access Road and Vehicle Turn Around Area. * Install One New 20 Vehicle Access Gate in Existing Fence. * Install One New 4 Pedestrian Gate in Existing Fence. * Top Soil and Seed.
Foundations:
* New Foundation (1) for New Control House. * New Foundation (1) for New Generator. * New Foundation (1) for New Generator Fuel Tank.
In-Ground Work:
345KV Yard:
* Install New Ground Grid Connections to the Existing Ground Grid for: New Control House, New Generator and New Generator Fuel Tank. * Install New Underground Raceways as Shown on Conduit Plan. * Modify Existing Pull Box #1 at the Existing Control House. * Install New Trench #2 from the Existing Pull Box #1 to the New Control House. * There are Three Circuits which will Require Removal and Reinstallation to Facilitate the Installation of New Trench #2. These are Conduits #1, #7 and #27 as Shown on DWG C-18677-E. The Contractor shall Remove these and Replace with New. * Extend Existing Ground Grid for New Man Gate and Vehicle Access Gate.
|